Learning Center
Learn the equipment before you specify it.
Seventy-seven articles written by the people who design and build JMS equipment. Sizing rules, failure modes, cost drivers and side-by-side comparisons, with no sales pitch in the way.
Results
Start here
Six fundamentals that answer the questions we get asked most often.
Start with your role
Five ways into the same library. Pick the one that sounds like your day.
Browse by equipment
Three product families, each with its own working library.
Try it, don't just read it
Interactive tools built from our own webinars. Each one answers a specification question in under a minute.
Flocculator configuration selector
Four questions narrow the three Mega-FLOC configurations to one, and show the published reasoning behind the recommendation.
Open the selectorPlate settler vs tube settler
Built from the Myrtle Beach retrofit, where plate settlers took a plant from 45 to 60 MGD inside the existing footprint.
Biosolids storage sizing
Hopper, silo or storage bin. Built from the biosolids storage webinar and the eight articles already in this library.
Watch instead
Articles that carry the video with them.
The full library
All 77. Filter by division, equipment, or the question you arrived with.
Mega-TREATMENTBio-HANDLINGThe stripe on each row is the color of the banner that article opens with.
Still sizing something?
Send us the basin and the application. A JMS process engineer will come back with sizing and a specification you can put straight into the drawing set.
Which team can help?
A JMS process engineer reads every one of these.
