Success stories are always great, and even better when you are a contributor to the success. JMS supplied our Mega-SETTLER (Plate Settler System) for the new Fresno, CA Southeast Surface Water Treatment Facility. This facility was built to utilize surface water from the Sierra Nevada Mountains at the rate of up to 80 million gallons per day.
The JMS Mega-SETTLERS were started-up last summer and the plant reports that the results to date have been great. You can see more about the plant in one of our short “start-up” videos, or in this recent article from Valley Public Radio.